16/09/2020
Biogas injected into the natural gas grid: works begin!
Biogas injected into the natural gas grid: works begin!
Parc de l’Alba, which business area is known as Barcelona Synchrotron Park – also includes a future residential neighbourhood and different green areas (half of the total surface of the park) with an iconic 1km-wide biologic corridor.
Between 2007 and 2011, an excavation made in one of these green plots as the result of a former clay extraction activity was used to store waste bales from Barcelona Metropolitan Area waste recovery plants. Since the landfill has been closed, the biogas produced by the decomposition of bales organic material is extracted and burned in order to prevent its emission into the atmosphere.
To take advantage of the methane present in this biogas at a significant 60% concentration, Naturgy Energy Group (a Spanish utility formerly known as Gas Natural Fenosa), designed a pioneer project in Spain: setting up both an upgrading plant to filter methane and an injection plant to introduce this biomethane into the natural gas grid. The upgrading plant will use membrane separation technologies, an upgrading system that consists of the physical separation of CO2 and CH4 molecules based on their different size.
Once obtained all the permissions from the administrations and completed the bidding stage, Naturgy has started the construction of these two plants scheduled to start operating early next year.
Between 2007 and 2011, an excavation made in one of these green plots as the result of a former clay extraction activity was used to store waste bales from Barcelona Metropolitan Area waste recovery plants. Since the landfill has been closed, the biogas produced by the decomposition of bales organic material is extracted and burned in order to prevent its emission into the atmosphere.
To take advantage of the methane present in this biogas at a significant 60% concentration, Naturgy Energy Group (a Spanish utility formerly known as Gas Natural Fenosa), designed a pioneer project in Spain: setting up both an upgrading plant to filter methane and an injection plant to introduce this biomethane into the natural gas grid. The upgrading plant will use membrane separation technologies, an upgrading system that consists of the physical separation of CO2 and CH4 molecules based on their different size.
Once obtained all the permissions from the administrations and completed the bidding stage, Naturgy has started the construction of these two plants scheduled to start operating early next year.
More news
23/06/2016
Distributed Polygeneration: Barcelona Synchrotron Park Shares Its Experience
17/06/2016
Barcelona Synchrotron Park Sponsors the Fifth Ideas Generation Program
10/06/2016
The Nanoworld Is Designed and Observed In and Nearby Barcelona Synchrotron Park
02/06/2016
Mediterranean Corridor: an important infrastructure for Barcelona Synchrotron Park
26/05/2016
UAB University Makes Distance Wireless Charging a Reality
19/05/2016
HP Enters the 3D Printing Market