02/06/2021                    
Parc de l’Alba in a WHO publication on the redevelopment of contaminated sites
                                        
                 
                    
                                
                 
            
        Parc de l’Alba in a WHO publication on the redevelopment of contaminated sites
The World Health Organization’s (WHO) Regional Office for Europe has recently issued a free downloadable titled “Urban redevelopment of contaminated sites: a review of scientific evidence and practical knowledge on environmental and health issues (2021)”.
The publication is the result of a project in which Parc de l’Alba (whose business area is known as Barcelona Synchrotron Park) was involved. This study is part of the Health and Environmental Impact Assessment Program of the WHO European Centre for Environment and Health.
The project focuses on the study of scientific evidence, the review of practical cases and the analysis of the impact assessment processes (SEA, EIA, HIA, HHRA, HBM*) in relation to the remediation and subsequent reuse of contaminated sites. The aim of the project is to provide tools and knowledge for local and regional administrations to improve the management of old polluted sites redevelopment, rehabilitating these soils, which are an opportunity for sustainable urban development by reducing the use of natural or unaltered spaces.
In this WHO project, the Parc de l’Alba has contributed its experience with the restoration of Àrids Catalunya, an old 4 ha clay quarry located within the Park's perimeter. Exploited until the 1970s and subsequently filled with various types of waste, basically construction debris, including asbestos, this quarry, transformed by the way into an uncontrolled landfill, represented a problem for the environment and health.
In 2010, this cuvette was restored and later redeveloped. The site is now fully restored and reforested with a viewpoint and new paths marked for public use, and since 2012 it has been officially part of the Parc de l'Alba green corridor.
* (SEA, Strategic Environmental Assessment; EIA, Environmental Impact Assessment; HIA, Health Impact Assessment; HHRA, Human Health Risk Assessment; HBM, Health Biomonitoring)
The publication is the result of a project in which Parc de l’Alba (whose business area is known as Barcelona Synchrotron Park) was involved. This study is part of the Health and Environmental Impact Assessment Program of the WHO European Centre for Environment and Health.
The project focuses on the study of scientific evidence, the review of practical cases and the analysis of the impact assessment processes (SEA, EIA, HIA, HHRA, HBM*) in relation to the remediation and subsequent reuse of contaminated sites. The aim of the project is to provide tools and knowledge for local and regional administrations to improve the management of old polluted sites redevelopment, rehabilitating these soils, which are an opportunity for sustainable urban development by reducing the use of natural or unaltered spaces.
In this WHO project, the Parc de l’Alba has contributed its experience with the restoration of Àrids Catalunya, an old 4 ha clay quarry located within the Park's perimeter. Exploited until the 1970s and subsequently filled with various types of waste, basically construction debris, including asbestos, this quarry, transformed by the way into an uncontrolled landfill, represented a problem for the environment and health.
In 2010, this cuvette was restored and later redeveloped. The site is now fully restored and reforested with a viewpoint and new paths marked for public use, and since 2012 it has been officially part of the Parc de l'Alba green corridor.
* (SEA, Strategic Environmental Assessment; EIA, Environmental Impact Assessment; HIA, Health Impact Assessment; HHRA, Human Health Risk Assessment; HBM, Health Biomonitoring)
More news
        		        	
            	
                	28/01/2021                 
                Institutional visit to the Elena Renewable Gas Plant in Parc de l'Alba            
                	
            	
                	12/01/2021                 
                2021: the Alba synchrotron begins its mutation            
                	
            	
                	30/12/2020                 
                The Park has a new Urban Development Master Plan            
                	
            	
                	29/11/2020                 
                The director of Parc de l'Alba, Pere Solà, academic director of the new Postgraduate Course in Urban Planning and Health at the UPC School            
                	
            	
                	18/11/2020                 
                Catalan minister Ramon Tremosa visits the ALBA synchrotron and announces the creation of a public-private investment fund to improve knowledge transfer            
                	
            	
                	03/11/2020                 
                Catalonia, at the forefront of Europe in life sciences and health; the Alba synchrotron contributes to this leadership            
                    
        
        
        
    
 
                                     
                            		
                             
                                     
                            		
                             
                                     
                            		
                             
                
 
     home
home