16/09/2020                    
Biogas injected into the natural gas grid: works begin!
        Biogas injected into the natural gas grid: works begin!
                                        Parc de l’Alba, which business area is known as Barcelona Synchrotron Park – also includes a future residential neighbourhood and different green areas (half of the total surface of the park) with an iconic 1km-wide biologic corridor.
Between 2007 and 2011, an excavation made in one of these green plots as the result of a former clay extraction activity was used to store waste bales from Barcelona Metropolitan Area waste recovery plants. Since the landfill has been closed, the biogas produced by the decomposition of bales organic material is extracted and burned in order to prevent its emission into the atmosphere.
To take advantage of the methane present in this biogas at a significant 60% concentration, Naturgy Energy Group (a Spanish utility formerly known as Gas Natural Fenosa), designed a pioneer project in Spain: setting up both an upgrading plant to filter methane and an injection plant to introduce this biomethane into the natural gas grid. The upgrading plant will use membrane separation technologies, an upgrading system that consists of the physical separation of CO2 and CH4 molecules based on their different size.
Once obtained all the permissions from the administrations and completed the bidding stage, Naturgy has started the construction of these two plants scheduled to start operating early next year.
                 
                    
                                
                 
            Between 2007 and 2011, an excavation made in one of these green plots as the result of a former clay extraction activity was used to store waste bales from Barcelona Metropolitan Area waste recovery plants. Since the landfill has been closed, the biogas produced by the decomposition of bales organic material is extracted and burned in order to prevent its emission into the atmosphere.
To take advantage of the methane present in this biogas at a significant 60% concentration, Naturgy Energy Group (a Spanish utility formerly known as Gas Natural Fenosa), designed a pioneer project in Spain: setting up both an upgrading plant to filter methane and an injection plant to introduce this biomethane into the natural gas grid. The upgrading plant will use membrane separation technologies, an upgrading system that consists of the physical separation of CO2 and CH4 molecules based on their different size.
Once obtained all the permissions from the administrations and completed the bidding stage, Naturgy has started the construction of these two plants scheduled to start operating early next year.
More news
        		        	
            	
                	28/01/2021                 
                Institutional visit to the Elena Renewable Gas Plant in Parc de l'Alba            
                	
            	
                	12/01/2021                 
                2021: the Alba synchrotron begins its mutation            
                	
            	
                	30/12/2020                 
                The Park has a new Urban Development Master Plan            
                	
            	
                	29/11/2020                 
                The director of Parc de l'Alba, Pere Solà, academic director of the new Postgraduate Course in Urban Planning and Health at the UPC School            
                	
            	
                	18/11/2020                 
                Catalan minister Ramon Tremosa visits the ALBA synchrotron and announces the creation of a public-private investment fund to improve knowledge transfer            
                	
            	
                	03/11/2020                 
                Catalonia, at the forefront of Europe in life sciences and health; the Alba synchrotron contributes to this leadership            
                    
        
        
        
    
 
                                     
                            		
                             
                                     
                            		
                             
                                     
                            		
                             
                
 
     home
home