11/10/2018                    
Everything you’ve always wanted to know about Alba synchrotron
        Everything you’ve always wanted to know about Alba synchrotron
                                        The ALBA Synchrotron has published its annual report. This document covers the most remarkable activities of 2017, a selection of scientific highlights, technology reviews and facts & figures of the facility last year.
 
At page 8, we read:
“Alba in brief:
• User operations started in 2012 • 3 GeV 150 mA Top-Up operations with a current variation lower than 1% • 5900h of operation with 4650h user time - 98% availability • 21 M€ operation budget in 2017 • Proposals have increased from about 200 in 2012 to almost 400 in 2017. Average overboooking factor: 2 • User affiliation: 65% national, 30% European, 5% non-European • Eight beamlines in operation, three under construction, one under design and three pending approval”
To learn more about Alba: 110 other pages available here.
                 
                    
                                
                 
            At page 8, we read:
“Alba in brief:
• User operations started in 2012 • 3 GeV 150 mA Top-Up operations with a current variation lower than 1% • 5900h of operation with 4650h user time - 98% availability • 21 M€ operation budget in 2017 • Proposals have increased from about 200 in 2012 to almost 400 in 2017. Average overboooking factor: 2 • User affiliation: 65% national, 30% European, 5% non-European • Eight beamlines in operation, three under construction, one under design and three pending approval”
To learn more about Alba: 110 other pages available here.
More news
        		        	
            	
                	03/01/2020                 
                AllRead MLT, a success story originated from the PRUAB’s Ideas Generation Program            
                	
            	
                	06/11/2019                 
                SENER, a top-class aerospace systems provider             
                	
            	
                	29/10/2019                 
                The ICN2 research center is involved in the quantum revolution            
                	
            	
                	21/10/2019                 
                Stradivarius keeps growing            
                	
            	
                	19/09/2019                 
                The president of Catalonia visited the Barcelona Synchrotron Park            
                	
            	
                	12/09/2019                 
                Alba, a tool to tackle challenges in the fields of renewable energy production and fight against air pollution            
                    
        
        
        
    
                                    
                            		
                            
                                    
                            		
                            
                                    
                            		
                            
    