01/03/2017                    
How Biodiversity is Supported in the Barcelona Synchrotron Park
        How Biodiversity is Supported in the Barcelona Synchrotron Park
                                        Parc de l’Alba, which includes its business area promoted as BARCELONA SYNCHROTRON PARK (BSP), is a 340 ha park undergoing urban development that pays particular attention to nature conservation, ecological restoration and support to the biodiversity.
This commitment was awarded in 2016 by the European Commission "Business & Biodiversity" label.
 
Mixed uses integrate the BSP, a residential land sector and extensive green spaces (190 hectares) for the conservation of biodiversity. One of the most iconic features is the green corridor, a large area of some 140 ha.
 
The Parc de l’Alba’s action program designed to enhance its green infrastructure and support biodiversity can be downloaded here.
 
This program is broken down into 5 core areas described in the document:
COREA AREA 1. Ecological restoration
CORE AREA 2. Application of ‘nature-based solutions’
CORE AREA 3. Ecological management of green spaces and pending building areas
CORE AREA 4. Supporting agriculture
CORE AREA 5. Healthy and educational network of paths
Contact: Consol Pérez, cperez@parcdelalba.cat
                    
                                
                 
            This commitment was awarded in 2016 by the European Commission "Business & Biodiversity" label.
Mixed uses integrate the BSP, a residential land sector and extensive green spaces (190 hectares) for the conservation of biodiversity. One of the most iconic features is the green corridor, a large area of some 140 ha.
The Parc de l’Alba’s action program designed to enhance its green infrastructure and support biodiversity can be downloaded here.
This program is broken down into 5 core areas described in the document:
COREA AREA 1. Ecological restoration
CORE AREA 2. Application of ‘nature-based solutions’
CORE AREA 3. Ecological management of green spaces and pending building areas
CORE AREA 4. Supporting agriculture
CORE AREA 5. Healthy and educational network of paths
Contact: Consol Pérez, cperez@parcdelalba.cat
More news
        		        	
            	
                	24/07/2019                 
                Port de Barcelona will have a rolling highway terminal            
                	
            	
                	04/07/2019                 
                New software to promote urban district heating and cooling networks            
                	
            	
                	07/06/2019                 
                Biodiversity in danger: Barcelona Synchrotron Park’s actions            
                	
            	
                	28/05/2019                 
                The UAB ranks first according to the CYD Foundation            
                	
            	
                	23/05/2019                 
                Alba: open day, workshop and last results            
                	
            	
                	25/04/2019                 
                The UAB Scientific and Technical Services: an opportunity for BSP’s companies            
                    
        
        
        
    
                                    
                            		
                            
                                    
                            		
                            
                                    
                            		
                            
    