27/05/2014                    
The new Barcelona Synchrotron Park bus shuttle completes its first six months
        The new Barcelona Synchrotron Park bus shuttle completes its first six months
                                        Coinciding with the arrival of multinational SENER company in the Barcelona Synchrotron Park (BSP), which inaugurated officially its new corporate headquarters in the park two weeks ago, the BSP opened a new bus line in last October in order to improve its accessibility.
More specifically, it is a bus shuttle that connects the FGC railway station of Bellaterra to the Rodalies railway station of Cerdanyola-Universitat, running through the BSP.
With a frequency adapted to companies working hours, this new connection notably improves the access to BSP.
This shuttle operates only on working days and belongs to the integrated ticket system of the Barcelona Metropolitan Area: it doesn’t represent any extra cost for someone arriving by public transportation.
Bus Estació FGC Bellaterra UAB – Parc de l’Alba (Cerdanyola del Vallès): timetable
                    
                                
                 
            More specifically, it is a bus shuttle that connects the FGC railway station of Bellaterra to the Rodalies railway station of Cerdanyola-Universitat, running through the BSP.
With a frequency adapted to companies working hours, this new connection notably improves the access to BSP.
This shuttle operates only on working days and belongs to the integrated ticket system of the Barcelona Metropolitan Area: it doesn’t represent any extra cost for someone arriving by public transportation.
Bus Estació FGC Bellaterra UAB – Parc de l’Alba (Cerdanyola del Vallès): timetable
More news
        		        	
            	
                	11/03/2015                 
                Sustainability: the Barcelona Synchrotron Park focuses on birds and bats…            
                	
            	
                	05/03/2015                 
                Wastewater that produces green energy            
                	
            	
                	26/02/2015                 
                ALBA, CSIC and Alibava develop an X-Ray detector            
                	
            	
                	20/02/2015                 
                The pressure that makes conductivity higher: new record in the ICN2            
                	
            	
                	11/02/2015                 
                Presentation of the Big Data CoE Barcelona initiative            
                	
            	
                	06/02/2015                 
                Come investigate at the ALBA synchrotron: 2015 new call for proposals            
                    
        
        
        
    
                                    
                            		
                            
                                    
                            		
                            
                                    
                            		
                            
    